Trades Tool · Live

Job Estimate Generator

Paste a scope; AI structures it into line items across labor/materials/subs/equipment with per-line costs and margin. Edit margins in real time and see total profit + price update live. Export a client-ready estimate and a contractor-ready cost sheet side by side.

Project loaded

Martinez — Master Bath Renovation

Full gut + replace. Remove existing tub, vanity, tile, fixtures. New walk-in shower (36x60), double vanity, porcelain tile floor, heated floor, new fixtures, vent fan, lighting. Minor plumbing re-rough (no wall moves). Paint included.

Cost
$25,852
Client price
$31,450
Profit
$5,598
Overall margin
17.8%
ItemCatQtyCostMargin %Client $
Demolition + disposal (dumpster + labor)labor1 lump$1,800$2,160
Framing adjustments + backerlabor8 hrs$760$950
Plumbing rough (sub)subs1 lump$3,200$3,680
Electrical rough + GFCI + vent fan (sub)subs1 lump$2,400$2,760
Heated floor membrane + thermostatmaterials56 sqft$1,008$1,310
Porcelain floor tile (Ann Sacks, Bloom Collection)materials56 sqft$784$1,019
Shower wall tile — 12x24 porcelainmaterials120 sqft$1,320$1,716
Niche + pencil trim accentsmaterials1 lump$380$494
Tile setting labor (floor + walls)labor36 hrs$3,420$4,378
Shower glass enclosure (frameless, custom)materials1 lump$2,900$3,422
Double vanity (60", quartz top, client-selected)materials1 lump$2,400$2,880
Plumbing fixtures (Kohler Alteo / Memoirs line)materials1 lump$1,650$2,063
LED vanity lighting fixtures (2)materials2 ea$560$728
Plumbing finish (sub)subs1 lump$1,400$1,610
Electrical finish (sub)subs1 lump$900$1,035
Paint + preplabor1 lump$650$845
Final clean + punchlabor1 lump$320$400

Client-facing estimate (drafted)

ESTIMATE — Martinez — Master Bath Renovation
May 31, 2026

SCOPE
Full gut + replace. Remove existing tub, vanity, tile, fixtures. New walk-in shower (36x60), double vanity, porcelain tile floor, heated floor, new fixtures, vent fan, lighting. Minor plumbing re-rough (no wall moves). Paint included.

INVESTMENT
Total: $31,450
Includes all materials, labor, licensed subs, permits, disposal, final clean.
Does NOT include: unforeseen hidden conditions behind walls, client-selected upgrades above allowance, or any structural changes beyond the stated scope.

PAYMENT SCHEDULE
30% at contract signing — $9,435
30% at demo + rough-in complete — $9,435
30% at tile + fixtures set — $9,435
10% at punch-list completion — $3,145

TIMELINE
Estimated 3-4 weeks from start. Exact start date confirmed upon contract signing + material lead-time confirmation.

WARRANTY
1 year on labor. Manufacturer warranties on materials.